更多的石油设备抵达刘易斯顿
发布日期:2010-11-26    浏览次数:0

 刘易斯顿,爱达荷州(美联社) - 八更多的韩国制造的,在阿尔伯塔省的石油项目的约束模块,加拿大已经到达了刘易斯顿港

       星期天抵达的设备加入了其他十几个超大型货物运输服务的许可,以等待美国高速公路12拖运到蒙大拿州。

  帝国石油等八大模块到达口,在10月15日的一周。刘易斯顿港经理大卫Doeringsfeld告诉刘易斯顿论坛报,他预计将达到40个模块之前,蛇和哥伦比亚水系驳船刘易斯顿是封闭在十二月初的14个星期的维修量。

  Doeringsfeld说,港口有足够的空间来存储所有40个模块,以及四个来自康菲负荷,五月抵达,并预定在被拖到比林斯炼油厂,勃朗峰。


  LEWISTON, Idaho (AP) - Eight more Korean-made modules bound for an oil project in Alberta, Canada have arrived at the Port of Lewiston.

  The equipment that arrived Sunday joins a dozen other loads of oversized cargo awaiting permission to be hauled on U.S. Highway 12 into Montana.

  Eight other modules for Imperial Oil arrived at the port during the week of Oct. 15. Lewiston Port manager David Doeringsfeld tells the Lewiston Tribune that he expects 40 modules to reach Lewiston before the Snake and Columbia river system is closed to barge traffic in early December for 14 weeks of repairs.

  Doeringsfeld says the port has enough room to store all 40 modules, as well as four loads from ConocoPhillips  that arrived in May and are slated to be hauled to a refinery in Billings, Mont.

相关新闻
  • 2023-12-11 | 公司新闻
    中天泰和职工 团结协作 清除积雪
    2023年12月11日上午,公司办公室发出清扫厂区积雪的通知后,广大职工积极...
    View More
  • 2023-10-20 | 公司新闻
    泰山区在中天泰和举行ACF联合创新实验室签约仪式
    2023年10月19日上午,泰山区在山东中天泰和实业有限公司举行ACF联合创...
    View More
  • 2023-09-28 | 公司新闻
    中天泰和董事长吕建云关怀员工健康 中秋节为员工发放特殊礼物ACF人工软骨鞋垫
    2023年9月28日下午,在中秋佳节即将来临之际,山东中天泰和实业有限公司董...
    View More
首页 产品 新闻 联系